Search
Close view of a contemporary condominium facade with pale brick, black-framed windows, a recessed glazed entry, and burgundy Japanese maple leaves.

In Edgewater, the Condo Document a Seller Must Hand Over Exists Only When Reserves Fall Short

When you buy a resale condo in New Jersey, the 2025 amendment to the state's structural-integrity law requires the seller to hand you one specific condo-safety document before you sign. It's a notice in 20-point bold type saying the association has chosen to fund its capital reserves at 85% of a funding plan from its own reserve study. The notice also has to state the year a special assessment or loan is expected and how much it will be.

For a buyer, the trouble is that this notice only exists when the association has decided to save less than its plan calls for. If the association funds at 100%, no notice is produced and the seller has nothing of this kind to hand over. On a resale, neither the structural inspection report nor the reserve study comes to you automatically, and in Edgewater those are the two documents that tell you the most about a building. New-construction sales work differently, because the law requires the developer to make inspection and reserve-study documents available to prospective purchasers before the contract date.

The Notice That Travels With the Sale

The rule comes from P.L.2025, c.132, approved August 21, 2025. Associations that existed when the original law took effect now have two ways to fund their capital reserves. They can follow one of the funding plans in their most recent reserve study, or they can fund 85% of a plan. The 85% option comes with two conditions. Before adopting the budget, the board has to send that bold-type notice to every unit owner. And before a purchase contract is signed, the seller has to give the buyer a copy of the most recent notice.

The statute's wording is specific about what the notice must contain:

"The notice shall provide the year in which a special assessment or loan is anticipated as a result of the reduced funding of the capital reserve fund, and the anticipated amount of the special assessment or loan that shall be required as a result of the decision by the executive board of the association."

The 85% option has an end date. An association can't use it for more than five of its fiscal years after the amendment took effect. The amendment also removed the original law's catch-up schedule, which had required reserve shortfalls to be closed within ten fiscal years or two, depending on how large the needed fee increase was. The two funding choices replaced it. Older explainers that describe the ten-year catch-up rule describe a rule that no longer applies.

For a seller, this is the one document with a clear trigger. If your association elected 85%, the latest notice has to be in the buyer's hands before the contract is executed, which puts it on the pre-listing checklist rather than the closing one. Greenbaum's October 2025 alert on the amendment describes the same mechanics: owners get advance warning of the projected assessment or loan, and buyers get the latest notice before signing.

The Documents Nobody Has to Hand You

The notice is a summary of a decision. The underlying facts are in two other documents, and the law sends each of them somewhere other than to a buyer.

Document Who has to have it Where the law sends it How a buyer gets it
85% funding notice Associations that elect 85% funding Every unit owner, then the buyer before the contract Seller must provide it
Structural inspection report Owners of "covered buildings" Municipal officials or the enforcing agency; available to residents on request Ask the seller, who as a resident can request it
Capital reserve study with a 30-year funding plan Nearly every association, covered or not The association's own budgeting Ask the seller or the association

The reserve study is the broader document. Under P.L.2023, c.214, it has to list capital components, likely repairs and the cost of structural inspections and corrective maintenance, along with a 30-year funding plan. Developments with less than $25,000 in common-area capital assets are exempt. The 2025 amendment requires reserve studies and reviews at least every five years and defines adequate funding as a plan in which the reserve balance never drops below zero.

The inspection report covers the building's bones. It reviews the primary load-bearing system, including the foundation and attached balconies, and identifies needed maintenance. The law also lets a board assess owners or borrow for corrective work on that load-bearing system without an owner vote. To do so, the board needs a finding backed by a licensed engineer's or architect's report that the work is needed for safety, legal compliance or to avoid higher costs from delay. An inspection report showing structural repairs is therefore an early warning of a bill the board can impose without an owner vote.

In Edgewater, Materials Decide Which Report Exists

The inspection report only exists for a "covered building." The law defines that as a residential condominium or co-op with a concrete, masonry, steel or hybrid primary load-bearing system, including heavy timber and podium-deck buildings, and it excludes certain wood-frame and mostly rental structures. The state Department of Community Affairs, in its structural integrity and reserve FAQ, says plainly that "the height of your association building has no bearing" on coverage. The reserve-study requirement applies whether a building is covered or not.

That matters more in Edgewater than in a typical Bergen County town because the condo stock spans several building eras along a few miles of River Road:

  • Hudson Harbor Condominiums, 1203 River Road: 246 units over 22 stories with a brick façade, built in 1971.
  • Independence Harbor: a low-rise complex built in phases from 1989 through 2002, with 525 units including 28 townhouses.
  • City Place at the Promenade: two high-rise condominium buildings inside a mixed-use complex.
  • Grand Cove: a nine-acre waterfront development that a 1989 New York Times article described as 51 townhouses and 106 midrise apartments.

A brick exterior or a low height doesn't tell you what holds a building up. The association's answer about its primary load-bearing system decides whether there is an inspection report to ask for at all.

The building's age decides when that report was due. The original law was approved January 8, 2024. The inspection schedule works like this:

  1. Certificate of occupancy issued 15 or more years before January 8, 2024: initial inspection due within two years, which was January 8, 2026.
  2. Certificate of occupancy issued less than 15 years before that date: inspection due within one year after the building's 15th certificate-of-occupancy anniversary.
  3. Buildings completed after the law took effect: inspection due within 15 years of the certificate of occupancy.
  4. Any covered building with observable damage to the load-bearing system: inspection due within 60 days, whichever comes first.

As of this week, any covered building in Edgewater whose certificate of occupancy dates from before January 8, 2009 is past its initial inspection deadline. Construction dates like 1971, or phases that wrapped up in 2002, point toward that group, but the certificate-of-occupancy date is what counts. For a buyer, the first questions are whether the building is covered and when its certificate of occupancy was issued. If it's covered and the certificate predates that cutoff, the report should already exist.

The Lender Reads the Same Paper

Fannie Mae's condo guidance says it doesn't require lenders to review reserve studies to decide whether a project qualifies, though underwriters may use them. Inspections are a different matter. As of August 2025, 3.6% of projects in its system carried an "ineligible" status, and one of the top two reasons was "critical repair issues, including failure to meet state or local inspection requirements." When a project doesn't meet those requirements, loans on its units can't be sold to Fannie Mae until the problem is fixed.

So the inspection report you have to ask for is also something a mortgage underwriter may weigh. A buyer who sees it early has time to react before financing is on the line.

This Fall, Buyers Have Room to Ask

Bergen County's attached-home market is giving buyers that time. In September 2026, according to the New Jersey REALTORS® Bergen County report current as of October 9, townhouse and condo inventory rose 14.2% year over year to 667 homes, and months of supply climbed from 3.2 to 3.7. Closed sales fell 14.1% to 164, and sellers received 99.6% of list price, down from 100.7% in September 2025. The median sale price still rose 5.6% to $527,000, and median days on market held at 42.

These are countywide figures, not Edgewater's alone. Still, prices are rising while buyers have more choice and pay slightly less relative to list. A buyer in that position can ask for the reserve study and inspection report before signing, and a seller who has them ready answers the questions most likely to slow the deal. Our guide to Edgewater condo and co-op fees covers the monthly side, and these documents show where those fees are likely to go.

This post is general information about state law, not legal or financial advice. Confirm how these rules apply to your building and your contract with your attorney and lender.

Quick Answers

Does a high-rise automatically need a structural inspection? No. Coverage depends on the load-bearing materials, and DCA says height doesn't factor in.

Who pays for the inspection and the reserve study? Both are common expenses shared by all unit owners.

Is the law about to change again? Two Senate bills introduced in 2026 propose changes. S146 would limit covered buildings to those three stories or taller, and S3406, introduced February 9, 2026, would let associations apply to DCA to lower reserve obligations based on risk-reducing features. Both are proposals, and the rules above are the ones in the enacted statutes.

If you're buying or selling an Edgewater condo, The Parlay Group will help you get the reserve study, the inspection report and any 85% notice in hand before the contract, while there's still room to negotiate. Let's Connect.

Work With Us

We pride ourselves in providing personalized solutions that bring our clients closer to their dream properties and enhance their long-term wealth. Contact us today to find out how we can be of assistance to you!

Follow Us on Instagram